AD4S - Basement Shack/Office
January, 2006
Wall Insulation in and Sheet Rock Hung
Now comes the hard part. All of the low and high voltage wiring is pulled and some already wired to outlets. All of the seams have fiberglass mesh tape and all the corner bead is in. Some mud has been applied to stabilize some of the larger seams.
The opening in the 2nd picture is under where the waste water line goes out through the foundation. The current plan is to put a cabinet in that corner with an "N" guage model railroad set on top of it and I put a platform in the opening that will be the mountain tunnel. I went ahead and put the sheet rock over it since I don't know when the train will get here.
So on to the mud, finishing and trim.
Pickett, AD4S